Our past work.
Flexible.
Adaptable.
Airbus Broughton New Wing Facility
Abrasive blast cleaning to SA2.5 and application of a multi coat epoxy coating system into white polyurethane finish. Over 2000 Tonnes of structural steel work, with Large beams up to 5 tonnes each and approximately 17M long.
London Orbit Observation Tower
(London 2012 Olympics)
Abrasive blast cleaning to SA2.5 Application of 3 Coat Epoxy Coating System Into Red polyurethane finish.
Echo Arena Car Park (2018)
Abrasive blast cleaning to SA2.5 and application of a Jotun Epoxy Coating system into White polyurethane finish. Over 1200 Tonnes of Modules and steelwork completed, over 80 number modules 15.4M Long x 2.4M Wide x 1.5M High
Honda UK Manufacturing
Over 2000 Steel Stillages abrasive blast cleaned removing all existing coating and application of an Alkyd Coating.
Connahs Quay Power Station for ABB
Tank Plates
Large contract of Tank plates approximately 8M Long x 2M Wide, abrasive blast cleaned to SA2.5 and application of a weldable primer to one side of the plates and application of 500microns of a bitumen coating to the other side.
Large Ductwork
Abrasive blast cleaning to SA2.5 and application of 1000 Microns of a glass flake lining to the internal, application of 3 coat epoxy coating system to the external surfaces.
JCB Uttoxer
Paint stripping and coating removal.
Some of the other contracts we have had a pleasure of working on include.
- Duke Street, Liverpool
- Hyde Bus Station
- JCB Uttoxeter
- Halewood Leisure Centre
- Manchester Airport
- CanalSide, Chester
- Lookers, Chester
- North Wales Swim Centre, Llandudno
- Birkenhead Park Pavilion
- 5th Avenue, Trafford Park
- Chill Factor Ski Slope Complex
- Heathrow Terminal 5
We take on projects of all sizes. Need to discuss your project?
Get in touch below
Telephone
Tel : +44 (0) 1244 541177
Hours
Mon-Fri 8am - 4.30pm
Location
Hunter Steel Limited
Pinfold Lane, Alltami,
Mold, Flintshire.
CH7 6NZ
enquiries@huntersteel.co.uk