The ability to support projects nationwide large and small. 

Work Facilities at Hunter Steel Ltd

About our Mold Manufacturing site

  • 5 acre site (14,000 m2). Fully tarmacked site, secure with palisade fencing and CCTV.
  • Blast room 75’ x 50’ (23m x 16m), completely steel lined and environmentally controlled.
  • Painting/coatings area 230’ x 53’ (70m x 16m) complete with a variety of Specialist Graco airless spray-painting pumps.

Continued..

  • Full handling facilities, including craning facility, 4 x 7 tonne forklift trucks. Heavy lifts by arrangements.
  • Environmentally controlled works area.
  • A further 3 acre storage/laydown area available if required (12,000m2)
  • A separate smaller workshop for small projects.
  • A variety of dry blasting and vapour blasting machines complete with a large variety of blasting media’s.